Cooling tunnel (chewing gum) – Gabler
Logo Gabler
Need help with your project ?

Cooling tunnel (chewing gum)

Conditioning the Gum
Built by Gabler, the cooling tunnel sits between rolling and scoring and the separation or coating steps.

 

Controlled Climate
Temperature- and humidity-controlled air.

 

Ready to Separate
Brings sheets to the right hardness for breaking.

 

Line Integration
Matched to Gabler rolling and scoring lines.

 

Cut & Wrap Lines
For cut-and-wrap products, an extruder forms several ropes and a cooling tunnel with up to 13 levels feeds the packaging machines, at up to 2,000 kg/h.

Benefits

Great for making

Chewing / Bubble gum products

Chewing / Bubble gum products

We provide support for your project

From feasibility studies to final commissioning, EPS provides the technical expertise needed to boost your productivity. Whether you’re installing a new line or upgrading existing equipment, we turn your requirements into high-performance reality.